What We Do

Services

Everything we handle, from framing a new deck to fixing one that's falling apart.

HomeServices

Everything we take on

Every job below is one we do ourselves across Anaheim.

Deck Installation

We frame new decks with pressure-treated joists on properly sized footings, tied back to the house with flashed ledger boards. Whether you choose redwood, cedar or composite decking on top, the framing underneath gets built to the same standard either way.

Deck Repair

Soft spots near the house usually mean the ledger board or rim joist has taken on water and started to rot. We cut out the damaged framing, replace it, and reflash the connection so it doesn't happen again in the same spot.

Deck Staining & Sealing

Anaheim sun is hard on exposed wood, and an unsealed deck will gray and check within a season or two. We pressure wash, let the boards dry fully, then apply a penetrating stain or clear sealer rated for UV exposure.

Custom Deck Design

Some yards call for a single low platform off the back door, others need two levels with a stair run and built-in bench seating. We design around how you'll actually use the space, not just how it photographs.

Composite Decking Installation

Composite boards don't split or splinter the way wood does, but they still need proper joist spacing underneath, usually 16 inches on center instead of 24. We install with hidden fastener clips so the surface stays clean and screw heads never show.

Deck Railing Installation & Repair

California code calls for guardrails at 36 to 42 inches with baluster gaps under 4 inches, and a lot of older decks don't meet that anymore. We rebuild railing systems to spec and make sure the posts are actually bolted through the rim joist, not just toe-screwed.

Deck Resurfacing

If the frame underneath is still sound but the decking is cupped, splintered or fading, we can pull the old boards and replace them without rebuilding the structure. It's a faster, cheaper way to get a deck looking new again when the bones are still good.

Deck Framing & Structural Repair

A deck that bounces when you walk on it usually has undersized joists or a beam spanning further than it should. We check the framing against current span tables and add joists, sistering or a mid-span beam where the numbers don't hold up.

Deck Waterproofing & Under-Deck Drainage

Water pooling under a raised deck rots the framing from below where you can't see it happening. We install under-deck drainage systems that channel water off the joists and away from the house, so the space underneath stays usable too.

Pergolas & Deck Covers

A lot of our deck clients ask for shade once the deck itself is finished, especially on west-facing yards that get full afternoon sun. We build attached pergolas and shade covers tied into the same posts and beams as the deck, sized to actual wind load for this area.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Anaheim, CA

Deck work covered throughout Orange County within about 50 miles of Anaheim.

Anaheim, CA
Long Beach, CA
Santa Ana, CA
Irvine, CA
Huntington Beach, CA
Garden Grove, CA
Fullerton, CA
Orange, CA
Costa Mesa, CA
Mission Viejo, CA
Yorba Linda, CA
Brea, CA
Common Questions

Things worth asking

Questions that come up once a deck project is actually underway.

Is a permit needed to build a deck in Anaheim?
Most decks over 30 inches above grade need a building permit and inspection, and any deck attached to the house needs the ledger connection inspected. Lower platform decks close to grade sometimes don't require one, but it's worth confirming before framing starts.
How long does it take to build a deck?
A straightforward single-level deck usually takes one to two weeks from framing to final boards, weather and permit timing aside. Multi-level decks with stairs, built-in seating or a cover take longer, sometimes three to four weeks.
Can a deck be built to a specific budget?
Budget usually drives the decking material choice more than anything else, since pressure-treated wood costs less upfront than composite or cedar. Square footage and railing style are the other two numbers that move the total the most.
Is deck work guaranteed?
Workmanship is covered for a set period after completion, and manufacturer warranties on composite decking or hardware are passed along separately. Details get spelled out in the written quote.
Who handles questions once a deck project is underway?
One point of contact stays with the job from the first cut to the final walkthrough, so the project doesn't have to be re-explained to a different person each visit. That same person handles any changes that come up along the way.
What decking materials are used?
Pressure-treated pine, cedar, redwood and composite decking are all installed regularly, each with different upkeep and cost. Composite costs more initially but doesn't need restaining, while wood is cheaper upfront and needs sealing every couple of years.
Can the house still be used while a deck is being built?
Deck construction is exterior work and usually doesn't affect access to the house, aside from some noise from saws and nail guns during the day. If the ledger board attaches near a specific room, there may be a day or two of limited access to that door.
How should a yard be prepared before deck construction starts?
Clearing furniture, planters and anything breakable away from the work area helps materials move without delay. Marking the location of sprinkler lines or buried cable ahead of time also avoids surprises when footings get dug.
What happens if rot or damage is found once the old deck is torn out?
Hidden rot in ledger boards, rim joists or posts often isn't visible until old decking comes off, and it's common enough to expect as a possibility. Any additional repair gets priced and approved before proceeding, not added to the bill afterward.
How should a finished deck be maintained?
Wood decking should be resealed every one to two years depending on sun exposure, and composite decking just needs regular washing to clear dirt and pollen. Keeping planters and hoses off the boards for long stretches prevents staining and trapped moisture underneath.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (657) 571-6147